• Technical

    • Appointment: 2009
    • Construction Start: 2012
    • Completion: 2013
    • Area: 1839m²
    • Form of Contract: Design & Build
    • Client: Private
    • Contractor: Shell: Claremont; Fit out: Link
    • Structural Engineer: Rodrigues Associates
    • Quantity Surveyor: Emmaus
    • Planning Consultant: DWD
    • Lighting Designer: Anna Sbokou
    • Cinema Technical Design: Sound Associates

Byfeld Hall was opened in 1906. During its life it has been a cinema, dance hall and recording studio used by bands including the Rolling Stones and U2. The scheme creates two cinemas within the original auditorium, and above these, an attic storey office. The foyers, restaurant, private members’ bar and library, and a recording studio are arranged around the original auditorium.

  • Technical

    • Appointment: 2009
    • Construction Start: 2012
    • Completion: 2013
    • Area: 1839m²
    • Form of Contract: Design & Build
    • Client: Private
    • Contractor: Shell: Claremont; Fit out: Link
    • Structural Engineer: Rodrigues Associates
    • Quantity Surveyor: Emmaus
    • Planning Consultant: DWD
    • Lighting Designer: Anna Sbokou
    • Cinema Technical Design: Sound Associates
Tweet this page
>